RNI Environmental Platform

RNI CETP

Digitize the CETP from sample request to final report.
RNI CETP combines a CETP-focused LIMS with transport, laboratory, reporting and management workflows—creating one digital information layer across industrial effluent operations.

Sample → ReportEnd-to-end traceability
Transport + LabConnected workflows
Dashboards + AlertsReal-time visibility
Nandesari Industries Association CETP plant
RNI CETP LIMS dashboard
From plant operations to management visibility

NIA CETP reference imagery + RNI CETP LIMS digital workflow

WHY CETP OPERATIONS NEED A DIGITAL LAYER

Replace fragmented registers with one connected CETP workflow.

The CETP presentation identifies manual data handling, delayed reporting, compliance risks, lack of real-time visibility and data inconsistency as key challenges. RNI CETP addresses these through centralized sample management, transport workflows, automated reporting, dashboards, alerts and audit trails.

Manual data handlingMove away from fragmented entries.
Delayed reportingShorten the path from test to report.
Compliance risksMaintain traceable digital records.
No real-time visibilityUse dashboards and alerts.
Data inconsistencyStandardize workflow and records.
CETP PROCESS + RNI DIGITAL AUTOMATION

See the CETP journey as one connected information flow.

The physical treatment plant continues to perform the treatment. RNI CETP LIMS digitizes the information surrounding that operation—requests, pickup, sample identity, laboratory work, results, approvals, reports and management visibility.

01
Industry / MemberEffluent generated and service requirement initiated.
02
Online RequestCustomer/sample request captured digitally.
03
Pickup / TokenPickup scheduling, booking and token management.
04
TransportVehicle, route, inward and chain-of-custody records.
05
Sample IDGenerate and track a unique sample identity.
06
LaboratoryAssign tests, capture results and manage work status.
07
Review & ReportQuality review, report generation and release.
08
DashboardManagement visibility, alerts and historical records.
RNI CETP LIMS Digital Automation Layer
Auto IDSample identity & barcode
WorkflowAssignment & status
Data LoggingResults & records
ReportsAutomated report generation
AlertsOperational visibility
Audit TrailHistory & traceability
WHAT RNI CETP COVERS

A CETP-focused platform built around the real operating workflow.

01

Sample Management

Online sample requests, sample acceptance, unique sample IDs, barcode-based tracking and end-to-end sample status.

02

Transport Management

Pickup scheduling, route information, vehicle tracking, inward records, transporter workflows and chain of custody.

03

Pipeline Management

Daily meter entries, pipeline sample collection and digital registers for pipeline-linked operations.

04

Laboratory Workflow

Assignment, testing, result capture, work status, review and report generation through the LIMS workflow.

05

Compliance & Reporting

Audit trails, auto data logging, historical access and configurable regulatory-oriented reports.

06

Dashboards & Alerts

Operational dashboards, sample summaries, status visibility, capacity views and alerts for management action.

RNI CETP IN ACTION

Real screens from the CETP management solution.

The supplied RNI CETP presentation demonstrates dedicated dashboards and registers for laboratory, transport, vehicle, pipeline, bookings and reporting operations.

RNI CETP LIMS laboratory dashboard
CETP / Lab Dashboard — sample summary, status distribution, customer analysis and tanker capacity views.
RNI CETP transport management dashboard
Transport Dashboard — vehicle trips, maintenance, fleet status and vehicle allocation.
RNI CETP pipeline register
Pipeline Register — meter entry and pipeline sample collection.
RNI CETP vehicle inward register
Vehicle Inward Register — customer, vehicle, CETP quantity, timings and unloading details.
RNI CETP reports center
Reports Center — booking, discharge, billing, test records, sample register and transporter reports.
RNI CETP other source sample collection
Other Source Sample Collection — structured sample request and collection information.
NIA CETP REFERENCE

See the environment in which a CETP digital platform operates.

Nandesari Industries Association (NIA) operates a Common Effluent Treatment Plant in GIDC Nandesari. Its public information describes a CETP, analytical laboratory, hydrodynamic cavitation-based treatment approach and online monitoring initiatives. RNI's CETP solution is designed to provide the digital workflow and management layer around such operations.

NIA CETP Nandesari plant

NIA CETP — Nandesari

Reference plant imagery from the public NIA CETP gallery. The image identifies the Nandesari Industries Association CETP and a stated consented capacity of 12 MLD.

NIA CETP R&D building

Plant + Laboratory + Data

The NIA gallery also documents its laboratory and treatment infrastructure. RNI CETP connects the operational data generated around these functions into one workflow.

CETP TREATMENT — PHYSICAL PROCESS

Digital management does not replace treatment. It makes the operation measurable and traceable.

Actual treatment trains differ by plant and effluent characteristics. The example below illustrates a simplified CETP journey; for NIA, public information describes hydrodynamic cavitation as part of its treatment approach.

Industrial Sources

Member industries generate and pre-treat effluent before it enters the common facility.

CETP Treatment Train

Plant-specific physical / chemical / biological processes treat the received effluent.

CollectionEqualisationTreatmentFiltrationDischarge / Reuse

Monitoring & Compliance

Laboratory results, operational records and monitoring information support decisions and reporting.

BUSINESS IMPACT

Turn CETP information into operational control.

50%Manual work reductionReference benefit stated in the supplied CETP presentation; actual outcome depends on deployment and workflow adoption.
FasterReporting cycleReduce manual movement between registers, testing and report preparation.
TraceableSample & transport historyConnect request, vehicle, sample, testing and report records.
6–12 mo.Reference ROIIndicative ROI period stated in the supplied presentation; actual ROI requires site assessment.
CETP KNOWLEDGE

Understand the physical plant—and then see where RNI fits.

For independent background on CETPs, this IIT Roorkee case-study lecture provides an educational overview of CETP concepts, industrial effluent characteristics, pre-treatment, inlet standards and treatment considerations.

▶

CETP process reference

Use the video for treatment-process context; use the RNI CETP workflow above to understand how requests, transport, samples, laboratory work, reports and dashboards can be digitized around the plant.

Video: IIT Roorkee case-study lecture on Common Effluent Treatment Plants.

QUESTIONS

RNI CETP — Frequently Asked Questions

What is RNI CETP?

RNI CETP is a CETP-focused digital management and LIMS solution covering online requests, sample tracking, transport, laboratory workflows, reporting, dashboards, alerts and audit trails.

Does RNI CETP automate the physical treatment plant?

RNI CETP automates the information and management workflows around the plant. Physical equipment automation, PLC/SCADA control and instrumentation integration should be evaluated and specified separately for each plant.

Can RNI CETP manage tanker and vehicle operations?

Yes. The supplied solution includes pickup scheduling, booking/token management, vehicle tracking/status, vehicle inward records, route information and chain-of-custody workflows.

Can it manage pipeline samples and meter entries?

Yes. The supplied CETP solution includes a Pipeline Register with daily meter entry and pipeline sample collection workflows.

Can RNI CETP generate reports?

Yes. The solution includes automated report generation and a Reports Center covering booking, discharge, billing, test records, sample registers and transporter-related reports.

Can RNI CETP be configured for another CETP?

Yes. RNI's platform approach is configurable around the customer's workflow. A site-specific requirement study can define sample types, parameters, reports, transport rules, approvals, dashboards and integrations.

READY TO DIGITIZE YOUR CETP?

Bring samples, transport, laboratory and reporting into one connected platform.

Tell RNI about your CETP capacity, member industries, sample workflow, transport model and reporting requirements. We can map the right digital architecture for your operation.